Can You Tile Over Tiles? How to Check Yours First

The short answer
Can you tile over tiles?
Yes, if the old tiles are solid, flat and dry, and they're not in a shower. Your doors and appliances also need room for about 10 to 12 mm more height. If tiles sound hollow, or are loose or cracked, fix or lift them first. On a floor, a floating floor laid over the tiles is often the easier cover.
Tiling over old tiles skips the noisy, dusty job of taking them up. But the new tiles stick to the old ones, so the old ones must be stuck fast.
Below, you can check your own tiles in four quick questions. Then see how much height a new layer adds, and what the rules say about showers. We also compare the costs, and other ways to cover old floor tiles.
Check your tiles: can you tile over them?
This checker covers the four things that decide it: hollow tiles, cracks, wet areas and height.
Can you tile over your tiles?
Answer four quick questions. Your answer shows below.
Where are the tiles?
Tap each tile with a coin. Do any sound hollow?
Are any tiles cracked or loose?
On a floor, will doors and appliances clear about 12 mm more?
Your answer
Yes, you can tile over them
Your tiles pass the checks. Prep them well, and the new tiles have a solid base.
How to prep them
- Clean and degrease the tiles, then let them dry.
- Sand or grind sealed or polished tiles.
- Roll on a primer made for tiling over tiles.
- Lay the new tiles in a flexible tile adhesive.
Or float a new floor over them
Our hybrid clicks together over sound tiles, with no adhesive or grout. It adds 6.5 or 9.5 mm.
Hybrid over tilesLaying hybrid is $35 a m² in our instant quote. We sell tiles, but a tiler lays them.
Your answer
Yes, you can tile over them
Your tiles pass the checks. Prep them well, and the new tiles have a solid base.
How to prep them
- Clean and degrease the tiles, then let them dry.
- Sand or grind sealed or polished tiles.
- Roll on a primer made for tiling over tiles.
- Lay the new tiles in a flexible tile adhesive.
Plan for these
- Power points and switches need a licensed electrician to refit them.
- Wall taps may need a licensed plumber to bring them forward.
- Plan a trim for each edge where the new tiles stop.
We sell tiles, but a tiler lays them.
Your answer
Fix those tiles first
A few problem tiles can be fixed. Then the rest makes a good base.
How to fix them
- Mark each hollow, cracked or loose tile with tape.
- Lift it, and scrape out the old adhesive.
- Stick it back down, or fill the gap with patching mortar.
- Tap it again once it's set. Then tile over.
On a floor, you could float a hybrid floor over them instead, once they're fixed.
How to do the tap testYour answer
Lift them first
When lots of tiles sound hollow, they're letting go of the floor. New tiles stuck to them would fail too.
Take the old tiles up. Then lay the new ones on a sound, flat base.
In a home built before 1990, check what's behind old wall tiles first. The sheet behind them may hold asbestos.
How to remove tilesOur instant quote prices taking up floor tiles, and grinding the floor smooth, at $60 a m².
Your answer
Sort out the height first
A new layer of tile and adhesive adds about 10 to 12 mm. Your doors or appliances won't clear that.
Your choices
- Trim the doors. It's $75 a door in our instant quote.
- A dishwasher under a bench can't be trimmed. If it won't fit, lift the tiles.
- Or choose a thinner cover. Our vinyl planks add about 3.5 mm.
Your answer
Ask a licensed tradie
In a wet area, the membrane under the tiles matters most. You can't check it by looking.
Ask them to check
- The old membrane, and whether it needs redoing.
- The floor waste, and the slope down to it.
- The shower hob or step, and the door.
In Queensland, building work over $3,300 needs a QBCC licence. Ask for the certificate for any membrane work.
What the rules sayNot sure how to tap test your tiles? It's explained below, step by step.
When tiling over tiles works, and when it doesn't
Tiling over tiles works on a sound base, and fails on a bad one. Here's how to tell which you have.

| Check | Tile over them | Fix or lift first |
|---|---|---|
| Tap test | Every tile sounds solid | Tiles sound hollow or move |
| Cracks | No cracked tiles | Cracked tiles, or a crack along a line of tiles |
| Flat | No dips or raised edges | Dips, humps or tile edges sitting high |
| Damp | Dry, with no musty smell | Damp patches or white, salty marks |
| Where | Dry floors, walls and splashbacks | Showers, and bathroom or laundry floors |
| Height | Doors and appliances have room | Doors or appliances are already tight |
A few bad tiles can be fixed. But if lots of them fail, lift them all. Our guide on how to remove tiles shows how.
How to do the tap test
The tap test finds tiles that have come loose from the floor or wall behind them. You only need a coin.
- Tap every tile. Use a coin or the handle of a screwdriver.
- Listen. A solid tile gives a dull, firm knock. A hollow tile sounds higher and echoey.
- Mark the hollow ones. Put a strip of painter's tape on each one as you go.
- Count them. One or two can be fixed. Lots mean the old tiles are letting go, so lift them.

Tilers call hollow tiles drummy. The adhesive under them has let go, so the tile can move. Anything stuck on top moves with it.
Check the tiles are flat
Lay a long, straight piece of timber or a level across the tiles. Try it in a few directions, and look for gaps under it.
Queensland's building regulator, the QBCC, sets limits for new tiling. Under a 2 m straightedge, it must be flat to within 4 mm. And one tile edge mustn't sit more than 2 mm above the next.
Hold your old tiles to the same test. Fix any dips and raised edges before the new tiles go on. The numbers come from the QBCC's standards and tolerances guide.
Look for damp and cracks
Check for damp patches, white salty marks or a musty smell. They mean water is getting in, and that needs fixing first.
Look for a crack that runs along a line of tiles, or keeps coming back. That can mean the floor below is moving, and no new layer will hide it for long.
How much height does tiling over tiles add?
A new layer adds the new tile, plus the adhesive under it. Together, a floor tile and its adhesive are typically about 10 to 12 mm thick.
Tiles vary, so measure one of your new tiles. Then allow for the adhesive under it.

Before you start, check everything the extra height touches:
- Doors. A door that catches can be trimmed. It's $75 a door in our instant quote.
- Appliances. A dishwasher or fridge under a bench can't be trimmed. Measure the space first.
- The next room. A step forms at the doorway. A trim finishes the edge.
- Steps. Tiling a landing makes the step up to it taller.
- Bathrooms. The toilet, vanity, shower screen and floor waste all sit on the old floor.
Walls have the same problem at power points, switches, taps and window sills. Each one sits on the old surface.
Need less height? A floating hybrid floor adds 6.5 or 9.5 mm. Our glue-down vinyl planks add about 3.5 mm. See other ways to cover old floor tiles.
Can you tile over tiles in a shower?
Not as a DIY job. In a shower, the tiles don't keep water out of the walls and floor. The wet-area membrane under them does that.
The building code says where a shower must not let water through:
- The shower floor, including any hob or step-down. A hob is the raised lip at the edge of the shower.
- The shower walls, to at least 1800 mm above the floor.
- The joins, where the walls meet each other and the floor, and around pipes.
Two more rules matter when you add a layer. A floor with a floor waste, the drain in the floor, must slope down to it. The slope must be between 12.5 and 20 mm for every metre.
And a step-down shower must sit at least 25 mm below the floor outside it. Tile over one floor but not the other, and that step changes.
These rules are in the 2022 building code, Part 10.2 of its Housing Provisions. Queensland keeps this edition until 1 May 2027.
What you can't see from the surface
The membrane is under the old tiles, so you can't check it by looking. If your shower leaks now, new tiles on top won't fix it.
Some membranes are made to go over firmly fixed old tiles, with the maker's own primer. Not every membrane is. A licensed tradie picks the system and follows its instructions.
So does a sound old membrane need a new one? Only a tradie who checks it can tell you. The floor waste, the slope and the hob still have to work at the new height.
Lifting shower tiles puts the membrane at risk, too. So if you lift them, price a new membrane as well.
Who can do the work in Queensland?
In Queensland, building work worth more than $3,300 needs a QBCC licence. The wall and floor tiling licence covers the membrane for tiling work.
For membrane work over $3,300, a licensed contractor must do it and issue a certificate. Ask for it, and keep it with your home's papers.
Other states have their own rules. Ask any tradie for their licence number, and check it with your state's building regulator.
A bathroom, laundry or toilet floor?
These rooms are wet areas too, with rules at the edges and around the floor waste. Ask a licensed tradie before you tile over one.
Tiling over floors, walls and splashbacks
Where the tiles are changes what to watch for. Here's each place at a glance.
| Where | Tile over them? | Watch out for |
|---|---|---|
| Kitchen splashback | Often the easiest job | Power points, switches and the tile edges |
| Walls outside the shower | Yes, if the tiles are solid | Taps, edges, and the weight of two layers |
| Floors in dry rooms | Yes, if solid, flat and dry | Doors, appliances and steps |
| Showers, and wet-area floors | Ask a licensed tradie | The membrane, the floor waste and the slope |


Splashbacks and kitchen walls
A kitchen isn't a wet area under the building code. That's one reason splashbacks are often the simplest place to tile over.
Power points and switches have to come off and go back on over the new tiles. In Queensland, that's electrical work, so it needs a licensed electrician.
Where the new tiles stop, their edge shows. A tile trim, a thin metal or plastic strip, finishes it neatly. Our splashback tiles are a good place to start.
Bathroom and laundry walls
Outside the shower, walls tile over much like a splashback. Wall taps may need a licensed plumber to bring them forward.
Two layers of tiles weigh more than one. Ask your tiler if the wall can carry both.
In a home built before 1990, the wall sheet behind old tiles may hold asbestos. Queensland's asbestos site says it was often used in kitchens, bathrooms and laundries.
Tiling over leaves that sheet alone. Taking tiles off it still needs safety steps, so get it tested first.
Floors
Floors take the most wear, and height matters most there. Our tiles for floors are porcelain, and they suit walls too.
| Our tile | Use it on | Size and finish | Price |
|---|---|---|---|
| Brescia Earth | Floors and walls | 600 x 600 mm, matt, rated P3 for slip | $42.08 a m² |
| Brescia Iconic | Floors and walls | 600 x 1200 mm, honed | $53.08 a m² |
| Chroma | Walls only | 52 x 160 mm or 100 x 100 mm | $38 a m² |
P3 is a slip rating that suits a home floor. Large tiles, like Brescia Iconic, also need a flat floor. For a dry room, also compare a floating floor. See other ways to cover old floor tiles.

How to prepare old tiles for tiling over
Good prep is most of the job. Old tiles have a smooth glaze, so the new adhesive needs help to grip.
- Fix the problem tiles. Lift any hollow, loose or cracked tiles. Stick them back down, or fill the gaps with patching mortar.
- Clean and degrease. Scrub the tiles with a degreaser, such as sugar soap. Rinse with clean water, then let them dry.
- Roughen sealed or polished tiles. Sand or grind a sealed, polished or coated surface, so the adhesive can grip.
- Prime them. Roll on a primer made for tiling over glazed tiles.
- Use a flexible tile adhesive. Choose a flexible, cement-based adhesive whose label says it suits tiling over tiles.
- Keep the movement joints. Leave a joint at the edges, and over any joint in the old tiles. Fill it with a flexible sealant, not grout.
- Grout once the adhesive has set. That's often about a day. Check the adhesive's label.
Queensland's standards guide counts tiled floors as faulty without those joints. It lists them at the edges, and over joints in the floor below.
Follow the labels
Each primer and adhesive has its own instructions. Where they differ from this guide, follow the label.
New to grouting? Our guide on how to grout tiles walks you through it. Our tile calculator works out the boxes, adhesive and grout.
Tiling over tiles vs lifting them: what it costs
Tiling over saves the cost of taking the old tiles off. It can also save levelling the floor underneath.
Here are typical tiler rates across Australia, for labour only:
| Job | Per m² | Typical |
|---|---|---|
| Laying floor tiles | $40 to $90 | $60 |
| Laying wall tiles | $40 to $100 | $60 |
| Taking off old tiles | $20 to $55 | $35 |
| Levelling the floor, where needed | $15 to $50 | $30 |
| Wet-area membrane | $35 to $80 | $55 |
So lifting first adds about $35 a m² at typical rates, plus levelling where needed. In a shower, add a new membrane too.
One 12 m² floor, priced four ways
Here's a 12 m² floor in a dry room, covered four ways. Tiles and floors are at our prices on 11 November 2026.
| Way to cover it | Tiles or floor | Labour | Total |
|---|---|---|---|
| Tile over it with Brescia Earth | $606.00 | $720 | $1,326.00 |
| Lift the tiles, then retile | $606.00 | $1,140 | $1,746.00 |
| Float our 6.5mm hybrid over it | $456.84 | $420 | $876.84 |
| Glue our 2.5mm vinyl planks over it | $343.20 | $360 | $703.20 |
None of these include adhesive, primer, grout, glue or trims. Lifting may also need levelling, about $360 more here.
Vinyl planks need the grout lines filled first. Our instant quote prices levelling at $40 a m², where needed.
Floating our hybrid over the tiles also skips taking them up. Our instant quote charges $60 a m² to take up tiles and grind the floor. On this floor, that's $720.
Want your own numbers? Our instant quote prices laying our floors. For tiling, see tiling cost per m² and the cost to tile a bathroom.
Other ways to cover old floor tiles
You don't have to tile over old floor tiles to cover them. In a dry room, a new floor can go straight over sound, flat tiles.

A hybrid floor, floated over the tiles
Hybrid is a floating floor. The planks click together and rest on the tiles, with no glue or grout. Its underlay is attached, so nothing else goes under it.
- The tiles must be solid. Fix any hollow or loose ones first.
- Fill any grout lines wider or deeper than 3 mm.
- The floor must be flat within 2 mm under a 1 metre straightedge.
- It adds 6.5 or 9.5 mm, the thickness of our planks.
A handy person can lay a room in a day. Or we can lay it, at $35 a m² in our instant quote. Read hybrid flooring over tiles, then see our hybrid flooring.
Glue-down vinyl planks
Vinyl planks add the least height. With the glue, our 2.5mm planks raise the floor about 3.5 mm. Our 4.5mm planks raise it about 5.5 mm.
Vinyl is thin, so it shows what's under it. Fill the grout lines first, or they'll show through in time. Laying our vinyl is $30 a m² in our instant quote.
Every step is in our guide to vinyl flooring over tiles. Then see our vinyl flooring, or compare vinyl flooring thickness.


What about bathrooms, laundries and toilets?
Planks suit dry rooms, like living areas, hallways and kitchens. Bathroom, laundry and toilet floors are different.
The code's standard rules for those floors list tiles, sheet vinyl with sealed joins, or treated concrete. Queensland's building regulator says vinyl planks and hybrid don't meet those rules.
So keep tiles there, or ask a building certifier before you lay planks. Our guide to hybrid flooring vs tiles compares the two.
Tiling over tiles: common questions
Is tiling over tiles a good idea?
It can be, when the old tiles are solid, flat and dry, and outside the shower. It skips the cost and mess of lifting them. It's a bad idea over hollow or cracked tiles, or where doors are already tight.
What are the disadvantages of tiling over existing tiles?
It raises the floor or wall by about 10 to 12 mm. Doors, appliances, power points and taps may need adjusting. And the new tiles are only as solid as the old ones under them.
Can you tile over tiles in a shower?
Only with a licensed tradie. The wet-area membrane under the tiles matters most, and you can't check it by looking. The floor must still slope to the drain at the new height. In Queensland, membrane work over $3,300 needs a certificate from a licensed contractor.
Can you tile over bathroom floor tiles?
Sometimes, but get a licensed tradie to check first. The floor must still slope down to the floor waste. Its drain grate must come up to the new level, too. Check the door, the toilet and any shower step as well.
Can you tile over bathroom wall tiles?
Yes, outside the shower, if the old tiles are solid and flat. Clean and prime them, then use a flexible tile adhesive. Taps and power points may need a licensed plumber or electrician to bring them forward.
Can you tile over kitchen wall tiles?
Yes. A splashback is often the easiest place to tile over. Power points and switches need a licensed electrician to refit them over the new tiles. Plan a trim for each edge where the new tiles stop.
What adhesive do you use to tile over tiles?
A flexible, cement-based tile adhesive whose label says it suits tiling over tiles. Prime the old tiles first, with a primer made for glazed tiles. Follow the maker's instructions for both.
How much height does tiling over tiles add?
About 10 to 12 mm, for the new tile and the adhesive under it. Measure your new tile to be sure. A floating hybrid floor adds 6.5 or 9.5 mm. Our glue-down vinyl planks add about 3.5 mm.
How can I cover my floor tiles without removing them?
Lay a new floor over them. Our hybrid clicks together and floats over solid, flat tiles, with no glue. Glue-down vinyl planks work too, once the grout lines are filled. Both suit dry rooms, like living areas and kitchens.
What is the cheapest way to cover up old tiles?
Of the covers in this guide, our glue-down vinyl planks cost the least to buy, from $22 a m². Laying them is $30 a m² in our instant quote, plus filling the grout lines. Tiling over costs more, as a tiler's labour alone is about $60 a m². On a wall, tiling over still costs less than lifting the tiles first.